Drilling with Continuous Flight Auger (CFA)

Drilling with Continuous Flight Auger (CFA)


Significant increase of drilling performance can be reached when using a continuous flight auger which is installed in one continuous pass:

The soil which is loosened at the auger tip is conveyed to the surface by the auger flight.
Borehole wall is supported by the auger filled with drill spoil.
Use of a crowd winch facilitates penetration into hard soil formations.
Attaching a kelly extension increases the drilling depth by 6 – 8 m. Pile is concreted
through hollow stem by means of a concrete pump.
Concrete is pumped by a concrete pump through the hollow stem of the auger while extracting the auger.
Concrete feed pressure can be measured at the tip of the continuous flight auger.
Diameters 500 – 1200 mm
Drilling depths from 10 – 28 m